CertMate for Solar

Solar PV commissioning,
tested and on record.

A Solar PV Test Sheet built to AS/NZS 5033, AS/NZS 4777.1 and AS/NZS 5139, and a Solar Service Checklist for every maintenance visit after it, in the same account as your certificates and electrical test sheets. Record it on site, then send a clean, branded PDF.

Included in every Electrical plan, at no extra cost.

See it in action

Solar commissioning and service, start to finish

Test and commission the system on site, then keep every service visit on record. Plus four free solar design calculators, further down this page.

Solar Commissioning & Test Sheets
Full walkthrough · 1:24

Solar Commissioning & Test Sheets

Enter the panels, arrays, strings and inverters and the sheet builds the tests for you. Record string, insulation and earth continuity results, work through the commissioning checklists and generate a branded Solar PV Test Sheet.

Watch full walkthrough · 1:24

Solar Service & Maintenance
Full walkthrough · 1:28

Solar Service & Maintenance

Copy the system from its commissioning sheet, work through the service checklist, flag anything that needs work and compare string readings with the last visit. Set the next service date and your office gets an email reminder 30 days before it's due.

Watch full walkthrough · 1:28

Click or tap a card to watch the full walkthrough. Hover a card for a quick preview. Click to watch the full walkthrough. Tap a card to watch the full walkthrough.

Solar PV Test Sheet

The whole system on one record

Pick how many arrays, strings, inverters, batteries and gateway or backup units the job has and the sheet builds the rows for you. Record the module and inverter details, the calculated PV d.c. maximum voltage, the export or generation limit and the conditions at test.

Each string gets polarity, open circuit voltage (with the expected Voc alongside for comparison), short circuit and operating current. Each array gets insulation resistance at the AS/NZS 5033 test voltage for its system voltage, and every mounting rail, battery and gateway gets an earth continuity reading.

CertMate Solar PV Test Sheet: system details, inverter a.c. circuit readings, d.c. string tests, array insulation resistance and earth continuity

The first two pages shown. The full sheet goes on to the visual inspection, commissioning, battery and backup supply checklists, test instruments, notes and the declaration.

Solar PV commissioning and battery commissioning checklists in CertMate, every item marked Pass

Part of the sheet shown. The full visual inspection checklist and the backup supply checks are on it too, and every list can be edited and reordered to suit your company.

Commissioning

Checklists from the standards, edited to suit you

Visual inspection, commissioning, battery commissioning and backup supply checklists come pre-written from AS/NZS 5033, AS/NZS 4777.1 and AS/NZS 5139. Your company can edit any line, delete it, add your own or drag them into your own order, and mark a whole list as Pass in one tap when everything checks out.

The inverter's connection and disconnection times sit next to the AS/NZS 4777.1 limits, and any reading outside a standard's limit is listed on the finished sheet for you to check.

Solar Service Checklist

Service visits, with the next one never forgotten

Log each maintenance visit on a Solar Service Checklist. Copy the system's details from its commissioning sheet or last service in one tap, then work through checklists drawn from the maintenance schedules in AS/NZS 5033 and AS/NZS 5139, marking each line OK, Action required or N/A. Anything that needs work is summed up at the top of the finished checklist.

Set a recommended next service date and CertMate emails your office when it's 30 days away, so the next visit gets booked. "Start next service" sets up that visit for the same system, and the commissioning sheet can set the first service date too.

Taking string readings? Tick one box and record each string's Voc and Isc beside the last visit's figures. Otherwise it stays a quick visual checklist.

CertMate Solar Service Checklist: job and system details, an Action required summary, and checklist lines marked OK and Action required

The first pages shown. The full checklist goes on to Inverter & A.C., Battery System and Backup Supply (when fitted) and Monitoring & Handover, then Additional Work, findings, recommendations and the next service date.

Asset register

Every inverter and battery, with its own history

Each inverter, battery and gateway on a Solar PV Test Sheet becomes an asset in your register: make, model, serial, rating, commissioning date and next service due. Search by serial, model or customer, open the unit and see every commissioning and service record against it.

Type a serial on a Service Checklist and CertMate matches the unit already in your register, so every visit lands on the right inverter instead of creating a duplicate and the history stays in one place.

⚡ CertMate AI

Photograph the rating label. The details fill themselves in.

Photograph the inverter, battery or gateway label and CertMate AI reads the make, model, serial, rating and capacity into the sheet. Every value is marked "AI suggested" until you confirm it, anything it can't read clearly is left blank for you, and it never touches a reading or a result.

Photos, sorted as you take them

Tag each photo as the roof array, inverter, switchboard, d.c. isolator, battery, labels and signage and more, and every photo is added to the finished PDF.

Linked to the certificate

Link the Solar PV Test Sheet to the job's Certificate of Compliance so the two are filed together, the same way your electrical test sheets are.

Straight onto the job

Linked to a job in Fergus, Simpro or Work Flow Trade? The finished test sheet goes back onto the job on its own, the same as your certificates. See integrations

Works on the roof, signal or not

Keep filling in the sheet with no reception. It syncs once you're back in range, on any phone, tablet or computer.

Solar questions

Which standards is the Solar PV Test Sheet built to?

AS/NZS 5033:2021 for the PV array verification and commissioning tests, AS/NZS 4777.1:2024 for the inverter's commissioning (including the connection and disconnection times) and AS/NZS 5139:2019 for battery commissioning. The checklist wording is CertMate's own summary of each standard, so check it against your own copies.

Does the Solar PV Test Sheet cost extra?

No. It's included in every CertMate Electrical plan at no extra cost, alongside your certificates and electrical test sheets.

Can I record solar service visits?

Yes. The Solar Service Checklist covers each maintenance visit: system details copied from the commissioning sheet or last service, checklists drawn from the AS/NZS 5033 and AS/NZS 5139 maintenance schedules, optional string readings beside last visit's, and a recommended next service date - CertMate emails your office when it's 30 days away.

Can I change the checklists?

Yes. The commissioning and service checklists come pre-written, and your company can edit any line, delete it, add your own or drag them into your own order - every new sheet then follows it.

Does it cover batteries and backup units?

Yes. Each battery and gateway or backup unit gets its own details and earth continuity reading, with battery commissioning and backup supply checklists for the systems that have them.

Are the solar calculators free?

Yes. String Sizing & DC:AC Ratio, Solar DC Voltage Drop, DC Isolator & Fuse Rating and AC Voltage Rise are free for anyone to use, no login required.

Ready to ditch the certificate pad?

Start your free trial today. No credit card, no contract.

Start free trial

0 founding spots remaining. Lock in 20% off the standard rate for life. Learn more